Blog Archive: August 2017

Alfisti's picture

Systems Integration - Pass03

Work on sensor suite integration into the basic spaceframe has been continuing, with the latest pass covering three areas: refining the navigational radio telescope installation, initial passive sensor placement, and long range long-range investigative sensor placement.

Alfisti's picture

Systems Integration - Pass02

Thanks to work by the astronomy and sensors teams, we appear to be able to move forward with a forward facing radio telescope/long range navigational array, and a second integration pass on that system has been scheduled to pick up currently understood shortcomings of what had been, until Zoe the team working on the ATCA array came to the fore, considered something of a throwaway option.

While that discussion was underway though, integration of exterior systems into the design has been continuing, namely for the boat bay and propulsion array: